New Features
- Option to remove roofing under ‘over framing’
- There is now a “Sheathing Under Overframing” checkbox in the ‘Advanced’ inputs section when you input/edit an Attached Building.
- By default it is checked and all pre-existing models should come in with it checked.
- When checked we expect the old behavior (no sheathing is removed under over framed roof section)
- When this is un-checked, any buildings that this building frames against/over will have their roof panels cut under the over framing
- There is now a “Sheathing Under Overframing” checkbox in the ‘Advanced’ inputs section when you input/edit an Attached Building.
- New Total Costs, Price and Weight Tokens and Calc. Bases for each material category
- You can use these new tokens in package calculations or in document templates
- The New Total Cost, Price and Weight are:
- Framing
- Sheathing
- Trim
- DoorsAndWindows
- Accessories
- Trusses
- (Labor and Freight Total Cost/Price already are available)
- New Part Length controls for inside and outside corner trim
- Previously, we only supported this for other trim types (e.g. ‘Base Trim’) but not for corner trim.
- Similar to the existing Part Length controls for other trim, you can now specify lengths to send out specific part lengths for corner trim in any given job.
- Random Length parts now honor Part Length controls
- You can now use part length controls to specify length for random length materials for a given job
- For example, if LVL’s for Truss Headers are set up as ‘Random Length’, you can now limit lengths to 8,16 for a given situation. Previously you would get 60′ length on a 60′ building with no way to break it up to a commonly used length
- No longer report closest match SKU for trusses not found in the catalog
- The software will no longer report a SKU for trusses in a job that is not found in the catalog. Instead, any truss not found in the catalog will report ‘NOT EXACT MATCH’.
- All other functionality related to Not Exact Match trusses should remain the same